CrawlJobs Logo

Program Development Manager - Data Center Construction

meta.com Logo

Meta

Location Icon

Location:
United States , Menlo Park

Category Icon
Category:

Job Type Icon

Contract Type:
Not provided

Salary Icon

Salary:

170000.00 - 238000.00 USD / Year

Job Description:

The Program Development Manager role in DEC Planning & Development team is focused on supporting IDC’s capacity planning efforts related to the Leasing Portfolio. The role is responsible for representing DEC for all new leasing projects by leading the assessments and reporting of potential planned projects.

Job Responsibility:

  • Develop, assess and accurately report on planning project's cost, schedule and risk for the capacity planning each quarter/bi-annual/monthly submissions
  • Interfacing with internal teams (Strategic Planning, Site Development), finance and capacity teams to determine future work, including providing feedback on new lease feasibility with constructability/cost/schedule/risk/market factors
  • Coordinating with internal design and construction partners to deliver a comprehensive plan that represents cost/schedule/risk accurately
  • Communicating and reporting to leadership on status of Lease planning projects
  • Creating and maintaining CapEx budgets for new leases in the planning space
  • Creating and maintaining P6 schedules for new leases in the planning space, including e2e reporting
  • Providing feedback and pertinent information to cross-functional teams and peers to enable accurate delivery of a coordinated AI Supply Plan
  • Coordinating planning dates and constraints with Network teams for planned leases
  • Coordinate and communicate the plan across internal teams, enabling the execution teams to move forward with the approved plan
  • Review and comment on new leases exhibit and Tenant Fitout Amendments to ensure alignment with DECs expectations and commitments
  • Scenario planning to account for the capacity plan’s changing variables and responsible for supporting cross-functional teams with context on technical constraints as an expert in preconstruction, logistics and construction planning
  • Coordinate and align across all key DEC teams (e.g. design resources, supply chain allocations, feedback from construction sites, market knowledge) and partner closely with the DEC Systems Engineers for technical support and to provide a comprehensive assessment from DEC to the business

Requirements:

  • Bachelor's degree in a directly related field, or equivalent practical experience
  • 10+ years direct professional experience in project planning and construction management
  • Bachelor's degree in Construction Management, Mechanical/Electrical Engineering, Civil Engineering, Architecture, Quantity Surveying, or equivalent technical degree
  • Demonstrated knowledge to understand the design and deployment of technical electrical, mechanical and connectivity systems
  • Experience in commercial construction management (pre-construction, contracting, scheduling, estimating, cost management)
  • Knowledge of how to build, update, and apply the information found in project schedules including identification of the critical path
  • Coordination skills to lead a team of broad backgrounds and experience towards a single project outcome
  • Demonstrated experience in communication and reporting skills

Nice to have:

  • Primavera P6 experience
  • Unifier experience
What we offer:
  • bonus
  • equity
  • benefits

Additional Information:

Job Posted:
January 23, 2026

Job Link Share:

Looking for more opportunities? Search for other job offers that match your skills and interests.

Briefcase Icon

Similar Jobs for Program Development Manager - Data Center Construction

Project Manager – Data Center/Mission Critical

Manages entire construction projects for the Commercial Business Unit, specifica...
Location
Location
United States , Central Ohio and Other Domestic Locations
Salary
Salary:
88500.00 - 132700.00 USD / Year
caddellplans.com Logo
Caddell Construction
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • Minimum high school diploma/GED
  • 10 years' experience in the construction industry required
  • Four-year degree in engineering or construction management preferred
  • 7-10 years experience in the construction industry preferred
  • Shows leadership, concise execution of plans, vision of project future, and effective communication of vision to subordinates
  • integrity
  • strong written and verbal communication skills
  • Effective written and verbal communication skills
  • Working knowledge of all applicable Caddell processes and procedures
  • Strong client relations skills
Job Responsibility
Job Responsibility
  • Manages entire construction projects, including planning, directing, coordinating, or budgeting activities
  • Responsible for meeting job requirements and controlling costs
  • Assesses the scope of work and resources required
  • Verifies project estimate for completeness
  • Supervises total construction efforts to ensure the project is constructed by design, budget, and schedule
  • Plans, coordinates, and supervises onsite functions
  • Provides technical assistance
  • Oversees and reviews extra work estimating and issuance of change orders
  • Assumes responsibility for safety, quality, and productivity
  • Administers financial tracking systems to monitor project costs and forecast the remaining project cost
What we offer
What we offer
  • Paid vacations
  • company-paid holidays
  • company joint funding of medical, dental, and vision insurance
  • life and disability plans
  • 401k
  • gym membership reimbursement
  • use of company condominiums
  • Fulltime
Read More
Arrow Right

Data Center QA Engineer

Designs, develops, troubleshoots and debugs software programs for software enhan...
Location
Location
India , Bangalore
Salary
Salary:
Not provided
https://www.hpe.com/ Logo
Hewlett Packard Enterprise
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • MS/BS degree in Computer Science or equivalent experience
  • Expert knowledge of Layer 2 and Layer 3 technologies through validation or deployment of networking products
  • Hands-on experience with at least one popular Networking OS: JunOS, NXOS, IOS, EOS, or SONiC
  • Solid understanding of clos-based Data Center network architectures (3-stage and 5-stage)
  • Familiarity with Data Center protocols such as VXLAN and MP-BGP
  • Proficiency in Python programming
  • Strong grasp of Linux-based systems and network troubleshooting tools
  • A quality-focused mindset with a keen eye for identifying product and interaction limitations
  • Minimum 5+ years of relevant experience
Job Responsibility
Job Responsibility
  • Test IP networking-related software products to ensure they operate as defined by requirements
  • Build network configurations to model well-optimized network reference designs
  • Plan, develop, and execute automated and manual test plans
  • Provide constructive feedback, report issues, and interact with developers to deliver superior product quality
  • Review requirements from the Product Management team
  • Utilize network troubleshooting tools (packet captures, monitoring devices, log files, customer input) to resolve issues effectively
What we offer
What we offer
  • Health & Wellbeing benefits
  • Personal & Professional Development programs
  • Unconditional Inclusion environment
  • Fulltime
Read More
Arrow Right

Data Center QA Engineer

Designs, develops, troubleshoots and debugs software programs for software enhan...
Location
Location
India , Bangalore
Salary
Salary:
Not provided
https://www.hpe.com/ Logo
Hewlett Packard Enterprise
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • MS/BS degree in Computer Science or equivalent experience
  • Expert knowledge of Layer 2 and Layer 3 technologies through validation or deployment of networking products
  • Hands-on experience with at least one popular Networking OS: JunOS, NXOS, IOS, EOS, or SONiC
  • Solid understanding of clos-based Data Center network architectures (3-stage and 5-stage)
  • Familiarity with Data Center protocols such as VXLAN and MP-BGP
  • Proficiency in Python programming
  • Strong grasp of Linux-based systems and network troubleshooting tools
  • A quality-focused mindset with a keen eye for identifying product and interaction limitations
  • Minimum 5+ years of relevant experience
Job Responsibility
Job Responsibility
  • Test IP networking-related software products to ensure they operate as defined by requirements
  • Build network configurations to model well-optimized network reference designs
  • Plan, develop, and execute automated and manual test plans
  • Provide constructive feedback, report issues, and interact with developers to deliver superior product quality
  • Review requirements from the Product Management team
  • Utilize network troubleshooting tools (packet captures, monitoring devices, log files, customer input) to resolve issues effectively
What we offer
What we offer
  • Health & Wellbeing benefits
  • Personal & Professional Development programs
  • Unconditional Inclusion environment
  • Fulltime
Read More
Arrow Right

Facility Manager Italy

Facility manager’s main mission will be to manage and leverage the maximum power...
Location
Location
Italy , Milan
Salary
Salary:
Not provided
data4group.com Logo
DATA4 Group
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • Electrical engineering degree preferred or proven experience and knowledge of electrotechnical issues applied to the components of the entire electrical line-up of data centers: Transformers, UPSs, Generators, common symbols for components like resistors, capacitors, transformers, switches, and circuit breakers
  • Technical knowledge to pilot the various trades involved
  • Able to communicate in written and oral English
  • Deep understanding of Electrical Schematics: mastery in reading and interpreting electrical schematics and diagrams, focusing on power distribution, UPS systems, and cooling infrastructure relevant to data centers
  • Reading and Interpreting Schematics: Understanding Schematic Flow, how to follow the flow of circuits and identify the relationship between different components within a schematic. Component Identification and Function: Detailed study of the function of each component within a schematic and its role in the overall system
  • Advanced circuit analysis techniques to understand complex electrical systems within data centers
  • Practical Application of Schematics in Troubleshooting: Utilizing electrical schematics for effective troubleshooting and fault identification in data center infrastructure
  • Electrical System Design and Maintenance: knowledge of designing electrical systems for data centers, including redundancy configurations and energy efficiency improvements
  • Preventive and predictive maintenance practices for electrical equipment, based on manufacturer guidelines and industry best practices
  • Incident management, including root cause analysis and corrective action planning, with a focus on electrical system failures
Job Responsibility
Job Responsibility
  • Manage and leverage the maximum power from our suppliers, mainly with the FM supplier
  • Lead the day-to-day relationship in terms of planning, preparation and field execution according to the internal procedures
  • Monitor the infrastructure management activities of Datacenters leading technically all our suppliers
  • Work together with other FMs and other teams
  • Cover all technical areas in the Datacenter, with very strong needs on: Electricity, Low Current (access control, CCTV…) and H&S management, among others
  • Be one of the main players in the quality of service rendered by our suppliers, especially in terms of continuity
  • Work very closely with the different suppliers and mainly with the FM company with focus on: Planning maintenance, prepare corrective works (review and validation of changes and MOPs when required, attending dry runs, BMS follow up of the installation to ensure a good performance, supporting other teams that could require on the field support for projects (Construction, Service Delivery, Energy management, quality and compliance team, among others)
  • Work closely with the Critical Environment Manager supporting, from the technical perspective, all Incident management
  • Be part of the on-call team for Data4
  • Support the CEM and the CSM team in terms of customer communication providing them info related to maintenance operations, preventive planning, incident management, RCA analysis, action plans tracking, correctives, small projects follow up, BMS monitoring, reporting
  • Fulltime
Read More
Arrow Right
New

Construction Manager - Data Center Design, Engineering and Construction

Meta is seeking an experienced Construction Manager to join our Data Center Desi...
Location
Location
United States , Los Lunas
Salary
Salary:
150000.00 - 209000.00 USD / Year
meta.com Logo
Meta
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • Bachelors in engineering or construction management or equivalent work experience
  • 12+ years of work experience in the construction management industry
  • Multi-Project experience in large scale construction management, mission critical, infrastructure, and or data center construction
  • General knowledge of civil, structural, electrical, and mechanical systems
  • Knowledge of capital budget management and contract administration
  • Negotiation skills and experience providing solutions to problems
Job Responsibility
Job Responsibility
  • Manage the construction, commissioning, and turnover of a Data Center within a campus program
  • Manage the budget associated with the project
  • Manage the cost change process and negotiate best pricing
  • Manage the schedule and associated risks to ensure reliable and predictable turnover dates
  • Manage warranty and tenant improvement work in the live environment when/as necessary
  • Communicate upward regarding the status and risks of the project
  • Negotiate vendor and contractor contracts and purchase orders as needed
  • Mitigate risk for the project through pre-planning, innovative planning, and partnership
  • Develop cost savings solutions and identify project savings/underruns early
  • Partner with the General Contractor and other Vendors to build collaborative relationships
What we offer
What we offer
  • bonus
  • equity
  • benefits
Read More
Arrow Right
New

Construction Manager

Meta is seeking an experienced Construction Manager to join our Data Center Engi...
Location
Location
United States , Gallatin
Salary
Salary:
123000.00 - 176000.00 USD / Year
meta.com Logo
Meta
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • 7+ years of work experience in construction management
  • Multi-Project experience in large scale construction management, mission critical, infrastructure, and or data center construction
  • General knowledge of civil, structural, electrical, and mechanical systems
  • Knowledge of capital budget management and contract administration
  • Negotiation skills and experience providing solutions to problems
Job Responsibility
Job Responsibility
  • Manage the construction, commissioning, and turnover of a Data Center within a campus program
  • Manage the budget associated with the project
  • Manage the cost change process and negotiate best pricing
  • Manage the schedule and associated risks to ensure reliable and predictable turnover dates
  • Manage warranty and tenant improvement work in the live environment when/as necessary
  • Communicate upward regarding the status and risks of the project
  • Negotiate vendor and contractor contracts and purchase orders as needed
  • Mitigate risk for the project through pre-planning, innovative planning, and partnership
  • Develop cost savings solutions and identify project savings/underruns early
  • Partner with the General Contractors, Vendors, & Cross-Functional Partners to foster an environment of collaboration
What we offer
What we offer
  • bonus
  • equity
  • benefits
  • Fulltime
Read More
Arrow Right

Critical Facilities Technician

The Critical Facilities Technician (CFT) is responsible for all aspects of data ...
Location
Location
United States , Alpharetta
Salary
Salary:
Not provided
t5datacenters.com Logo
T5 Data Centers
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • High school degree, required
  • Prior military or technical school training, preferred
  • 5+ years’ experience in Mission Critical Environments
  • Strong Mechanical background
  • Trane/Leibert Certification a plus
  • Electrical or mechanical license, preferred
  • Ability to stand, walk, sit, climb, and balance
  • Ability to stoop, kneel, crouch and crawl using both arms and legs
  • Ability to pick-up minimum 60 lbs.
  • Ability to reach with both hands and arms
Job Responsibility
Job Responsibility
  • Operate and maintain critical and non-critical data center infrastructure, equipment, and systems
  • Work with a team of CFTs to deliver total availability (100% uptime) while minimizing risks
  • Monitor power, cooling capacity, and environmental conditions within the data halls
  • Utilize a Computerized Maintenance Management System (CMMS) as a tool to manage all planned and unplanned data center work
  • Perform preventive maintenance on data center electrical and mechanical equipment
  • Assist with the development, revision, and execution of approximately 200 operating procedures and preventive maintenance inspections, and perform quality control reviews to ensure accuracy, clarity, and continual improvement
  • Assist with the development of Data Center standards and policies when necessary
  • Resolve all electrical and mechanical issues within the Data Center quickly while minimizing risk and properly communicate issues to the appropriate chain of command
  • Respond to emergencies and critical issues as necessary and work independently and as a team, according to staffing and situation, towards complete recovery
  • Troubleshoot and document technical issues, escalates as appropriate, and ensure issue resolution
  • Fulltime
Read More
Arrow Right
New

Manufacturing Program Manager - Data Center Design, Engineering, & Construction

Manufacturing is a pillar within Meta’s Preconstruction Team supporting datacent...
Location
Location
United States , Menlo Park
Salary
Salary:
150000.00 - 209000.00 USD / Year
meta.com Logo
Meta
Expiration Date
Until further notice
Flip Icon
Requirements
Requirements
  • Bachelor’s degree or equivalent work experience in Program Management
  • 10+ years’ experience in construction, manufacturing, and/or project planning
  • Experience in large scale construction management and/or scalable manufacturing
  • Manufacturing-for-construction background with understanding of lean manufacturing and supply-chain management plus knowledge of production machinery, processes, and standards in the field or industry experience with developing workflows and their associated flowcharts, schedules, and action plans
  • Experience building consensus and communicate effectively with a wide range of audiences (stakeholders to executive leadership)
  • Proven track record of adaptability and complex problem-solving in a dynamic work environment
  • Proficient working knowledge of Google Workspace and Bluebeam
Job Responsibility
Job Responsibility
  • Program Management – lead coordination, document, and anticipate program needs to ensure cost, schedule, and quality in concert with the offsite manufacturing and integration with onsite construction
  • Supplier Production (manufacturing execution) – configure supply chain, production, scheduling, strategic inventory, logistics, and integration in collaboration with our procurement, construction management, and quality teams
  • Manage GC (General Contractor) Coordinators for logistics, planning, coordination, reporting, lessons learned, etc
  • Risk Matrix development, maintenance, and related reporting
  • Cost & Change Coordination with cross functional partners
  • Schedule Development with Engineering/Scheduling, GCs, & Suppliers
  • Regular Debriefs / Lessons Learned development, summary and communication to Engineering, Leadership, & cross-functional partners
  • Partner with cross functional teams on related efforts to ensure alignment and transparency across Design, Engineering, & Construction (DEC)
  • Partner closely with Sourcing Team for strategy and deployment of owner furnished equipment
  • Partner with Global QA/QC Team to identify and strategically shift to the vendors and manufacturers, appropriate elements of the multi-trade integration and commissioning efforts to reduce onsite efforts. Your objective is to embed as much trade work and commissioning as is appropriate at the optimum points of fabrication from start through to the final point of integration
What we offer
What we offer
  • bonus
  • equity
  • benefits
  • Fulltime
Read More
Arrow Right